top of page

Community Safety In Burlington, Ontario

Public·10 members

Rowen Fraser
Rowen Fraser

A detailed proposal for a new cycling artery.

I have been in discussions with a local cycling activist and he has been working on quite a detailed proposal to make cycling a viable way to transit the city without impeding traffic flow on our major arteries. Thanks very much to resident and local cycling advocate Joshua Boniface who has submitted this proposal. I have to hand it to him; at first our relationship was adversarial because we disagreed on certain aspects of cycling infrastructure. But it turns out that even though we were looking at the problem from different angles we were of a similar mind on how to improve it. Joshua has put a lot more thought into it than I have and I would like to share his work with everyone. Please leave comments or criticisms below and be respectful. You won't be banned if you behave badly, but your terrible behavior will remain as a monument for others to see.


454 Views
rjma99
Jun 19

Before even contemplating such $$$massive projects, there must be a proper economic impact study. Let’s not kid ourselves, this is a silver-plated bike trail. Other than some cyclists, who else needs this huge investment? A few kids walking to school who already pay little or nothing for a great bus service? Folks walking to the Centre for a visit? No shopping though. How will you carry the stuff home? It’s a bike trail.

 

And use whatever names you want, these “boxes” are tunnels - 4 tunnels. Even with lights and cameras, if they work, much of this route is through practically deserted industrial / commercial areas poorly accessible to emergrncy services, and NOBODY is going to use these except in bright mid-day, and then only if there’s sufficient traffic. Bikes might do so, but only because they’re faster through the risky parts.

 

SURELY we have smarter places to spend 22 Burlington + 4 Halton + 22 Provincial + 42 Federal dollars? If I read the 2025 Capital Budget for Burlington (about $105 million) and this project direct cost to Burlington taxpayers of $22 million, then this feel-good, poorly-examined project will cost ONE FIFTH of one years total Capital Budget of Burlington. Please explain where I am mistaken in calling this a boondoggle of the first order. Use REAL data and properly executed studies, no emotionality lease. It’s our money.

 

 

As an aside, refrence might be made to the work Toronto is doing on a new ped / cyclo bridge on Dowling Street, crossing both the Gardiner and the rail lines. Would not a bridge, with lateral downramps where desired, serve the actual purpose adequately, while minimzing safety, drainage and other issues? There are large amounts of space on either end to extend the length to minimize slope.

Members

  • laubin1laubin1
    laubin1
  • Rowen Fraser
    Rowen Fraser
  • rjma99rjma99
    rjma99
  • Doug B
    Doug B
  • baileycecilia47baileycecilia47
    baileycecilia47
bottom of page